Identify the total work to be done
Determine the rate of work
Use the formula: Work = Rate × Time
Rearrange as needed:
Time = Work ÷ Rate
Rate = Work ÷ Time
If multiple workers are involved, add their rates
If work is done in parts, calculate each part separately
Convert all units to the same system before calculating
Check the result for consistency with the given values
