Review the approved plans, specifications, permits, and inspection checklist
Verify the work matches the approved drawings and scope
Check site safety conditions before inspecting
Inspect materials for correct type, grade, and condition
Confirm layout, dimensions, alignment, and elevations
Examine foundations, framing, structural connections, and supports
Check workmanship for defects, gaps, cracks, misalignment, or damage
Verify electrical, plumbing, HVAC, and other systems are installed correctly
Inspect waterproofing, insulation, fireproofing, and weather protection
Confirm code compliance and required clearances
Test function of installed components and systems
Document findings with photos, notes, and measurements
Compare completed work against quality standards and contract requirements
Identify deficiencies, punch list items, and required corrections
Reinspect corrected items before approval
Sign off only when work meets all requirements