Define the canopy size, clearance, and load requirements
Obtain structural, fire, wind, and airport compliance requirements
Prepare detailed engineering drawings and fabrication plans
Select materials for frame, roof panels, fasteners, sealants, and finishes
Fabricate the main support frame
Fabricate secondary framing, brackets, and connection plates
Cut and prepare roof and side panel components
Apply corrosion protection and surface coatings
Assemble the frame sections on a level work area
Install roof structure and canopy panels
Install flashing, seals, and drainage components
Install lighting, signage, and utility conduits if required
Verify alignment, clearances, and structural connections
Perform quality checks for weatherproofing and load integrity
Transport components to the installation site
Erect and secure the canopy to the jet bridge structure
Connect all mechanical, electrical, and drainage systems
Test stability, sealing, and operational clearance
Inspect and certify the completed installation according to applicable codes
