Minimize land clearing to only the areas needed for construction
Preserve existing vegetation wherever possible
Install silt fences around disturbed areas
Use sediment barriers at slopes and drainage outlets
Stabilize exposed soil with mulch, seed, or erosion control blankets
Cover stockpiles of soil and aggregate
Phase construction to limit the amount of exposed ground at one time
Grade and slope the site to direct runoff safely
Install temporary drainage channels and diversion swales
Use check dams in ditches and channels
Protect storm drains with inlet filters or covers
Compact and stabilize site access roads
Use gravel pads at entrances and exits
Water dusty areas and exposed soil as needed
Inspect erosion control measures regularly
Repair damaged controls immediately
Remove sediment buildup from barriers and drains
Avoid working on steep slopes during heavy rain
Use retaining walls or terracing on steep areas
Schedule earthmoving during dry weather when possible