Acclimate the laminate flooring in the room for 48 to 72 hours
Remove existing flooring if needed
Clean and level the subfloor
Repair any cracks, holes, or uneven spots
Install underlayment if required
Measure the room and plan the layout
Leave an expansion gap around the walls
Start the first row along the longest straight wall
Cut off the tongue or groove as needed for the first row
Connect planks using the click-lock system
Stagger end joints between rows
Cut planks to fit at walls and obstacles
Use spacers to maintain the expansion gap
Tap planks together gently with a tapping block if needed
Install the last row by measuring and cutting to fit
Remove spacers after installation
Install baseboards or quarter-round molding
Clean the floor after installation
Avoid heavy traffic until installation is complete
