Acclimate the laminate planks in the room for 48 to 72 hours
Clean and level the subfloor
Remove baseboards or trim if needed
Install underlayment if required by the product
Plan the layout and stagger the end joints
Start along the longest straight wall
Place spacers between the planks and the wall
Connect the first row of planks
Cut the last plank in the row to fit
Use the leftover piece to start the next row if appropriate
Lock each new plank into the previous row
Tap joints together gently with a tapping block if needed
Continue row by row across the room
Cut planks to fit around doorways, vents, and corners
Maintain the expansion gap around all edges
Remove spacers after installation
Reinstall baseboards or trim
Install transition strips where flooring meets other surfaces
Clean the floor after installation
