Measure the room and calculate the flooring needed
Acclimate the vinyl planks or sheets if required by the manufacturer
Remove baseboards, trim, and any existing flooring if necessary
Clean the subfloor thoroughly
Repair cracks, holes, and uneven areas in the subfloor
Make sure the subfloor is dry, level, and smooth
Plan the layout and determine the starting wall
Snap chalk lines if needed to keep rows straight
Cut the first row of vinyl to fit the space
Install underlayment if required
Lay the first plank or sheet along the starting wall
Leave the recommended expansion gap around the edges
Connect planks using the click-lock system or apply adhesive for glue-down vinyl
Stagger end joints between rows
Continue laying flooring row by row
Cut pieces to fit around corners, doorways, and obstacles
Use a utility knife or flooring cutter for precise cuts
Roll the floor if required for adhesive installation
Install transition strips where needed
Reinstall baseboards and trim
Clean the finished floor and inspect for gaps or loose sections
