Acclimate the Pergo flooring in the room for the time specified by the manufacturer
Remove existing flooring, baseboards, and trim if needed
Clean, dry, and level the subfloor
Repair any damaged or uneven areas in the subfloor
Install underlayment if required for your Pergo product
Measure the room and plan the plank layout
Leave the required expansion gap around all walls and fixed objects
Start the first row with the tongue or groove facing the correct direction per the product instructions
Cut the first row planks to fit if needed
Use spacers to maintain the expansion gap
Lock the planks together row by row using the click-lock system
Stagger end joints between rows
Cut planks to fit around doorways, vents, and obstacles
Use a tapping block or pull bar if needed, following manufacturer guidance
Install the final row by measuring and cutting planks to width
Remove spacers after installation
Reinstall baseboards and trim without pinning the floor down
Install transition strips where required
Clean the floor according to Pergo care instructions
