Acclimate the hardwood flooring in the room for the recommended time
Remove baseboards, trim, and existing flooring if needed
Clean, dry, and level the subfloor
Repair any subfloor damage
Install underlayment or moisture barrier if required
Plan the layout and determine the starting wall
Measure the room and snap chalk lines
Cut door jambs and casings as needed for clearance
Install the first row with the tongue or groove facing the correct direction
Leave the required expansion gap around the perimeter
Secure the flooring using nails, staples, glue, or floating-click installation as specified
Stagger end joints between rows
Continue installing rows and maintain alignment
Cut boards to fit at walls, corners, and obstacles
Install the final row and use a pry bar if needed
Reinstall baseboards and trim
Fill nail holes and touch up as needed
Clean the floor and follow the manufacturer’s curing or use instructions